Implemented projects

Project: "Ognyanovo dam"
Status: Completed
Contractor: Metallurgical plant "Kremikovci"

 

 

Description: Earth embankment dam wall with clay core and concrete shield: height – 52 m; volume of the body of the wall – 1 600 000 m3; storage reservoir volume – 35,4 million. m3; length of crown – 1100 m and equipment – shutter shaft, main water outlet – tunnel with length 337 m and diameter 2,30 m, water intake tower, injection gallery, overflow and energy dissipator.. It is made a correction of "Mihov dol".

 

 

 


Project: "Construction of reservoir for drinking purposes, incoming plumbing and indoor plumbing for landed property 000273, territory of Gurmazovo village, Bojurishte Municipality"
Status: Currently implemented



Contractor: "National Company Industrial Zones" EAD
Description: Incoming plumbing HDPE PN10, DN90 – 474 m; Indoor plumbing HDPE PN16, DN160 – 841 m; Reservoir for fire protection and drinking purposes 300 m3, with pumping station.

 

 

 

 

 

 

Project: "Performance of construction works under the technical project for repairing of Marchaevo dam"
Status: Completed
Contractor: Sofia Municipality

 

 

Description: Construction of reinforced concrete safety parapet, L = 199.20 m; Repair of the revetment of the water swath of the dam wall, as it was restored the stone armor - 85.00 m3; It was replaced the revetment of the outgoing channel and the revetment of the spillway is also repaired; It was replaced the front grid of the main discharger; Cleaning of the dam; Over 2 800.00 m3 sediments were loaded and transported; It was built control and measurement system of the dam wall.

 

 

Project: "Cleaning, reinforcing and shaping the profile of Makotsevska River in Gorna Malina village"
Status: Currently implemented
Contractor: Gorna Malina Municipality

 


Description: Correction, cleaning and shaping of 1013 m of the profile of Makotsevska river and strengthening with gabions - 111 pieces and gabion mattresses - 617 pieces.

 

 

 

 

 

 

Project: "Closure and completion of the remediation of the second stage of Suhodol landfill for disposal of waste - quarter "Suhodol", district "Ovcha Kupel"
Status: Currently implemented
Contractor: Sofia Municipality

 


Description: At this stage are made the walls of gabions, ditches for atmospheric waters, drainage collectors and culverts with revision shafts. Laying of drainage geocomposites – 178 066 m2; polyethylene foil 1.5 mm -155 546 m2, geotextile 300g/m2 – 9336 m2

 

  

Project: "Landfill for municipal solid waste in Sofia, quarter "Suhodol"
Status: Completed
Contractor: Sofia Municipality

 

Description: Excavation and filling works – 156 202 m3; Operating road – 18 000 m2; Security fence – 2726 m; Drainage HDPE-pipes for clean water Ø 315 – 834 m; Drainage system for leachate from HDPE-pipes Ø 315 – 2 930 m; Laying of: НDPE foil 2,0 mm – 72 643 m2, drainage mat – 56 050 m2, geotextile 800 g/ m2 – 76 300 m2.

 

 

 

 


Project: "Highway Hemus, reparation of tunnel Topli dol"
Status: Completed
Contractor: Executive Agency "Roads" – prime contractor "Transstroy-Burgas" AD

 

Description: Cleaning of the superficies of the secondary revetment – 31 577 m2; Longitudinal draining collectors of HDPE pipes Ø300 – 3 609 m; Longitudinal draining collectors of HDPE pipes Ø160 – 3 500 m; Draining layer of geofilc – 8 609 m2; Hydro isolation PVC membrane 2 mm with masked layer of polyester felt 35 734 m2; Reinforcement – 157 048 kg; Concrete В 25 in metal framework – 1359 m3; Tertiary revetment of spraying concrete В 30 –1 768 m3.

 

 

 

Project: "Correction of Slatinska River in a section from dr. Ivan Selimski str. to the railway line Sofia-Plovdiv"
Status: Completed
Contractor: Sofia Municipality

 

Description: Total length – 1500 m; Excavation works – 62 000 m3; Filling works – 22 000 m3; Framework – 17 000 m2; Fixture – 400 t; Concrete – 7 800 m3

 

 

 

 

 

 

Project: "Regional landfill for municipal solid waste in the Municipalities of Gorna Malina and Elin Pelin"
Status: Completed
Contractor: Gorna Malina Municipality

 

Description: Vertical planning – 92 500 m3; Laying of HDPE foil and geotextile – 48 800 m2; Supply and laying of drainage pipes for leachate Ø 315 – 1 055 m; Construction of collecting shafts – 3 pieces.

 

 

 

 

 

 

Project: "Waste Disposal Site of the Municipalities Oryahovo and Miziya"
Status: Completed
Contractor: Oryahovo Municipality


Description: Excavation/filling works – 108 800 m3; Operating road – 35 500 m2; Safety fence 2 012 m; Drainage system for leachate from HDPE-pipes Ø315 - 881 m; Laying of: НDPE foil – 34 300 m2, drainage mat – 34 300 m2, geotextile – 34 300 m2; Surrounding dykes – 484 m; Pumping station; External water-main PE 80 – 5 899 m

 

 

 

Project: "Regional landfill for municipal solid waste in the municipality of Montana"
Status: Completed
Contractor: Montana Municipalit

 

Description: Laying of HDPE foil – 80 000 m2; Laying of geotextile 1200 g/m2 – 80 000 m2; Supply and laying of leachate drainage pipes, pumping station and leachate collection system; Construction of gas collecting system; System for leachate transportation – 3 800 m; Water main HDPE Ø125 – 4 210 m; Pumping station and reservoir for drinking water needs and reservoir for fire protection needs.

 

 

Project: "Regional landfill for municipal solid waste in the municipality of Sevlievo"
Status: Completed
Contractor: Sevlievo Municipality

 

Description: Laying of HDPE foil – 88 935 m2; Laying of geotextile 1200 g/m2 – 88 935 m2; Supply and laying of leachate drainage pipes, pumping station and leachate collection system; Construction of gas collecting system; System for leachate transportation from WWTP – HDPE pipes Ø150 – 6 500 m.

 

 

 

Project: "Pressure derivation Iskar"
Status: Completed
Contractor: Sofia Municipality

 

Description: Plumbing "Iskar" brings water from the "Iskar" dam to WTP "Bistrica" and WTP "Pancherevo". 12 km tunnel sections №1 – №6 are realized and also 1 km pipe connections between them with diameter 2740 mm. There are 4 pieces of control cameras. For the first stage of Sofia water supply, after tunnel № 6 to WWTP "Bistrica" and "Pancherevo" are built pressure pipe systems Ø1800 and Ø1020, 4 km length, which conducted 11 m3/sec.

 

 

 

Project: "Waste water treatment plant for potable water "Bistrica"
Status: Completed
Contractor: Sofia Municipality

 

Description: WWTP is built on a technological project of the French company "Degramon". The system of treatment is a single stage via rapid sand filters, type "Akvazur - V". WWTP receives fresh water from the "Iskar" dam via 13 km tunnel derivation, having a diameter of profile 2740 mm and 2.5 km steel pipeline Ø1800, which are also built by "Hydrostroy – Sofia" Ltd. For the treatment plant are built all necessary technological reagent stores. It is also built a laboratory building for continuously monitoring the quality of treated water, supplied to the water supply of the city of Sofia, so that it meets the legal requirements for drinking water.

 

Project: "Treatment of wastewater from WWTP Bistrica"
Status: Completed
Contractor: TAISEI Corporation, EBARA Corporation and Sofia Municipality


Description: The station is designed to purify the waste water from WTP "Bistrica" before their infusion into a water receiver second category. The wastewater treatment plant is built with grant financial aid from Japan.

 

 

 

 

Project: "Main sewerage branch I of the district "Gorublyane" – Sofia"
Status: Completed
Contractor: Sofia Municipality

 

Description: Laying of steel-concrete pipes Ø1000, Ø1200, Ø1400, Ø1600 – total 1 120 m, at a depth of 4.50 m below the roadway and Ø200, Ø300, Ø400 и Ø600 – 2 100 m. Excavation works – 12 625 m3; rubble – 10 000 m3; concrete – 1 000 m3.

 

 

 

 

 

 

 

Project: "Main sewerage branch V of Samokov city"
Status: Completed
Contractor: Samokov Municipality



Description: Total length – 2 384 m. Laying of steel-concrete pipes Ø1200, 1000, 800, 600, 400, 300, 200. Along the collector, the pipeline Ø160 is replaced with polyethylene pipes.