Project: "Ognyanovo dam" Status: Completed Contractor: Metallurgical plant "Kremikovci"
Description: Earth embankment dam wall with clay core and concrete shield: height – 52 m; volume of the body of the wall – 1 600 000 m3; storage reservoir volume – 35,4 million. m3; length of crown – 1100 m and equipment – shutter shaft, main water outlet – tunnel with length 337 m and diameter 2,30 m, water intake tower, injection gallery, overflow and energy dissipator.. It is made a correction of "Mihov dol".
|
|
Project: "Construction of reservoir for drinking purposes, incoming plumbing and indoor plumbing for landed property 000273, territory of Gurmazovo village, Bojurishte Municipality" Status: Currently implemented
Contractor: "National Company Industrial Zones" EAD Description: Incoming plumbing HDPE PN10, DN90 – 474 m; Indoor plumbing HDPE PN16, DN160 – 841 m; Reservoir for fire protection and drinking purposes 300 m3, with pumping station.
|
|
|
Project: "Performance of construction works under the technical project for repairing of Marchaevo dam" Status: Completed Contractor: Sofia Municipality
Description: Construction of reinforced concrete safety parapet, L = 199.20 m; Repair of the revetment of the water swath of the dam wall, as it was restored the stone armor - 85.00 m3; It was replaced the revetment of the outgoing channel and the revetment of the spillway is also repaired; It was replaced the front grid of the main discharger; Cleaning of the dam; Over 2 800.00 m3 sediments were loaded and transported; It was built control and measurement system of the dam wall.
|
|
|
Project: "Cleaning, reinforcing and shaping the profile of Makotsevska River in Gorna Malina village" Status: Currently implemented Contractor: Gorna Malina Municipality
Description: Correction, cleaning and shaping of 1013 m of the profile of Makotsevska river and strengthening with gabions - 111 pieces and gabion mattresses - 617 pieces.
|
|
|
Project: "Closure and completion of the remediation of the second stage of Suhodol landfill for disposal of waste - quarter "Suhodol", district "Ovcha Kupel" Status: Currently implemented Contractor: Sofia Municipality
Description: At this stage are made the walls of gabions, ditches for atmospheric waters, drainage collectors and culverts with revision shafts. Laying of drainage geocomposites – 178 066 m2; polyethylene foil 1.5 mm -155 546 m2, geotextile 300g/m2 – 9336 m2.
|
|
|
Project: "Landfill for municipal solid waste in Sofia, quarter "Suhodol" Status: Completed Contractor: Sofia Municipality
Description: Excavation and filling works – 156 202 m3; Operating road – 18 000 m2; Security fence – 2726 m; Drainage HDPE-pipes for clean water Ø 315 – 834 m; Drainage system for leachate from HDPE-pipes Ø 315 – 2 930 m; Laying of: НDPE foil 2,0 mm – 72 643 m2, drainage mat – 56 050 m2, geotextile 800 g/ m2 – 76 300 m2.
|
|
|
Project: "Highway Hemus, reparation of tunnel Topli dol" Status: Completed Contractor: Executive Agency "Roads" – prime contractor "Transstroy-Burgas" AD
Description: Cleaning of the superficies of the secondary revetment – 31 577 m2; Longitudinal draining collectors of HDPE pipes Ø300 – 3 609 m; Longitudinal draining collectors of HDPE pipes Ø160 – 3 500 m; Draining layer of geofilc – 8 609 m2; Hydro isolation PVC membrane 2 mm with masked layer of polyester felt – 35 734 m2; Reinforcement – 157 048 kg; Concrete В 25 in metal framework – 1359 m3; Tertiary revetment of spraying concrete В 30 –1 768 m3.
|
|
|
Project: "Correction of Slatinska River in a section from dr. Ivan Selimski str. to the railway line Sofia-Plovdiv" Status: Completed Contractor: Sofia Municipality
Description: Total length – 1500 m; Excavation works – 62 000 m3; Filling works – 22 000 m3; Framework – 17 000 m2; Fixture – 400 t; Concrete – 7 800 m3
|
|
|
Project: "Regional landfill for municipal solid waste in the Municipalities of Gorna Malina and Elin Pelin" Status: Completed Contractor: Gorna Malina Municipality
Description: Vertical planning – 92 500 m3; Laying of HDPE foil and geotextile – 48 800 m2; Supply and laying of drainage pipes for leachate Ø 315 – 1 055 m; Construction of collecting shafts – 3 pieces.
|
|
|
Project: "Waste Disposal Site of the Municipalities Oryahovo and Miziya" Status: Completed Contractor: Oryahovo Municipality
Description: Excavation/filling works – 108 800 m3; Operating road – 35 500 m2; Safety fence – 2 012 m; Drainage system for leachate from HDPE-pipes Ø315 - 881 m; Laying of: НDPE foil – 34 300 m2, drainage mat – 34 300 m2, geotextile – 34 300 m2; Surrounding dykes – 484 m; Pumping station; External water-main PE 80 – 5 899 m
|
|
|
Project: "Regional landfill for municipal solid waste in the municipality of Montana" Status: Completed Contractor: Montana Municipalit
Description: Laying of HDPE foil – 80 000 m2; Laying of geotextile 1200 g/m2 – 80 000 m2; Supply and laying of leachate drainage pipes, pumping station and leachate collection system; Construction of gas collecting system; System for leachate transportation – 3 800 m; Water main HDPE Ø125 – 4 210 m; Pumping station and reservoir for drinking water needs and reservoir for fire protection needs.
|
|
|
Project: "Regional landfill for municipal solid waste in the municipality of Sevlievo" Status: Completed Contractor: Sevlievo Municipality
Description: Laying of HDPE foil – 88 935 m2; Laying of geotextile 1200 g/m2 – 88 935 m2; Supply and laying of leachate drainage pipes, pumping station and leachate collection system; Construction of gas collecting system; System for leachate transportation from WWTP – HDPE pipes Ø150 – 6 500 m.
|
|
|
Project: "Pressure derivation Iskar" Status: Completed Contractor: Sofia Municipality
Description: Plumbing "Iskar" brings water from the "Iskar" dam to WTP "Bistrica" and WTP "Pancherevo". 12 km tunnel sections №1 – №6 are realized and also 1 km pipe connections between them with diameter 2740 mm. There are 4 pieces of control cameras. For the first stage of Sofia water supply, after tunnel № 6 to WWTP "Bistrica" and "Pancherevo" are built pressure pipe systems Ø1800 and Ø1020, 4 km length, which conducted 11 m3/sec.
|
|
Project: "Waste water treatment plant for potable water "Bistrica" Status: Completed Contractor: Sofia Municipality
Description: WWTP is built on a technological project of the French company "Degramon". The system of treatment is a single stage via rapid sand filters, type "Akvazur - V". WWTP receives fresh water from the "Iskar" dam via 13 km tunnel derivation, having a diameter of profile 2740 mm and 2.5 km steel pipeline Ø1800, which are also built by "Hydrostroy – Sofia" Ltd. For the treatment plant are built all necessary technological reagent stores. It is also built a laboratory building for continuously monitoring the quality of treated water, supplied to the water supply of the city of Sofia, so that it meets the legal requirements for drinking water.
|
|
|
Project: "Treatment of wastewater from WWTP Bistrica" Status: Completed Contractor: TAISEI Corporation, EBARA Corporation and Sofia Municipality
Description: The station is designed to purify the waste water from WTP "Bistrica" before their infusion into a water receiver second category. The wastewater treatment plant is built with grant financial aid from Japan.
|
|
|
Project: "Main sewerage branch I of the district "Gorublyane" – Sofia" Status: Completed Contractor: Sofia Municipality
Description: Laying of steel-concrete pipes Ø1000, Ø1200, Ø1400, Ø1600 – total 1 120 m, at a depth of 4.50 m below the roadway and Ø200, Ø300, Ø400 и Ø600 – 2 100 m. Excavation works – 12 625 m3; rubble – 10 000 m3; concrete – 1 000 m3.
|
|
|
Project: "Main sewerage branch V of Samokov city" Status: Completed Contractor: Samokov Municipality
Description: Total length – 2 384 m. Laying of steel-concrete pipes Ø1200, 1000, 800, 600, 400, 300, 200. Along the collector, the pipeline Ø160 is replaced with polyethylene pipes.
|
|